Wednesday, November 8, 2017

EZIALLA – IHUOWERI RD, ORSUMOGHU



EZIALLA – IHUOWERI RD, ORSUMOGHU

STEFFANUTTI is the contractor for this job.

The Length of this road is 6.95Km
The road has been cleared up to 2km. Two (2) one-box culverts has been done and Excavation for drains is still ongoing up to 800m while the Re-enforcement for casting of some precast drains is on ground. The Contractor is on site 



No comments:

Post a Comment

Erosion In Awka - Nibo Axis

Erosion Control in Anambra State around Awka- Nibo Axis