ADAZI
NNUKWU – NENI – NIMO BYPASS
CONTRACTOR: BENEJAF
CONTRACTOR: BENEJAF
Length of the
road is 4.81km
Work has
also commenced here with clearing done up to half of the road length from the 2nd
entrance of the road opposite Adazi Nnukwu cemetery. Rectangular drains
measuring 1.2m x 1.3m x 0.15m up to 700m on the Left Hand Side. Excavation for
drains, Backfilling of the already constructed drains and Casting of entrance
cover slabs are in progress
Contractor
is on site